22
Jul, 13

{Life Lately} week 12

wk12-3

It’s week 12 of the build already.  Things are continuing to progress at a steady rate.  This week we were able to see the moisture barrier and siding go up, as well as the electrical casings.  So, we are able to visualize where each light switch and outlet will be.  This phase and the next are where our pictures will come in handy for future reference, because we’ll know where every stud is and where the wires are running.  It’s just a good thing to know.

wk12-4
wk12-5
wk12-6
wk12-12
wk12-8
wk12-9
wk12-10

This is my view from the Kitchen nook looking towards the front entry.

wk12-11

The secondary bathroom upstairs already has the tub installed, so I imagine that the plumbing will follow here in the next few weeks.  Our jacuzzi tub and shower are also installed in the master bath!  I can’t wait!

wk12-14
wk12-13
wk12-2

Gotta love my braces in this photo.  That’s also a work in progress!  haha  As always, thanks for sharing in this adventure with us.

No comments yet.

Leave a Reply